Alcatel-carrier-internetworking-solutions Omni Switch/Router Manual de usuario Pagina 51

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 110
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 50
Omni Switch/Router Chassis and Power Supplies
Page 1-21
Grounding a Chassis
Omni Switch/Routers have two grounding screw holes on the back of the chassis. These
holes use 10-32 screws and are approximately 1 inch apart. In addition, these holes do not
have paint and are surrounded by a small paint-free rectangular section, which provides for a
good connection contact.
The figure below shows the location of the grounding screw holes on the back of an
OmniS/R-9. They are located approximately four (4) inches from the bottom of the chassis
and approximately one (1) inch from the left-hand side of the rear of the chassis.
Grounding Screw Holes on an OmniS/R-9
On an OmniS/R-5, the grounding screw holes are located approximately one (1) inch from
the bottom of the chassis and approximately one (1) inch from the left-hand side of the rear
of the chassis.
On an OmniS/R-3, they are located approximately four (4) inches from the bottom of the
chassis and approximately one (1) inch from the left-hand side of the rear of the chassis.
Lifting Handle
Grounding Screw Holes
Vista de pagina 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 109 110

Comentarios a estos manuales

Sin comentarios